Project Blog

About

The UC Davis deferred maintenance blog page provides more information about specific projects supported by DM funding. Not every DM project project has a corresponding blog article. These blog posts can be filtered by the categories listed on the right. These categories are the same as those found in the Deferred Maintenance Project Plan

Dairy Barn receives power upgrade

May 18, 2018
Thanks to deferred maintenance funding, the Electrical Systems team in Building Maintenance Services recently finished installing a new electrical panel that can handle 200 amps of power.

Room with a view: Tupper Hall railing replacement

March 29, 2018
This spring 2018, Tupper Hall, home to approximately 24 different departments in the School of Medicine and the School of Veterinary Medicine, is the site of a project to replace the rotting guardrails that line every side of the building from top to bottom.

Classroom Makeovers

October 03, 2017
UC Davis just finished renovations to 10 classrooms, another milestone in the Classrooms Work Group’s plan to refresh all 130 general assignment rooms at least once a decade. 

Landscape Renovation

August 15, 2017
Worn out and/or high-water landscapes received new irrigation systems and beautiful, low-water, plantings that support pollinators and are perfect for our area’s Central Valley climate.

Irrigation Improvements

June 01, 2017
In 2017 Grounds and Landscapes Services campus irrigation team installed smart irrigation systems.